Recent Projects
Wayne Hills
School Renovation
2010-2011
Location: Waynesboro, Virginia
Design and project management for a complete renovation and upgrades to a 60-year-old school building, including new HVAC, a new commercial-grade kitchen, ADA-compliant restrooms, a wheelchair lift, an updated electrical system, window replacement, and asbestos and lead abatement.
This 30,000 square foot project went from concept to completion in 10 months, and was completed at a cost of approximately $30 per square foot.
McQuay International Office
Expansion Phase I & II
LEED Silver Certified 2010
Location: Augusta County, Virginia
First LEED Silver Certified building in the Central Shenandoah Valley
Project and engineering management for a major office mezzanine and building renovation and expansion.
Over 12,000 square feet of offices completely gutted and renovated with new lighting, HVAC and building shell upgrades.
Reduced energy consumption by 22% and water
consumption by over 40%
WhiteWave Foods Employee Amenities Area
2009-2010
Location: Mount Crawford, Virginia
5,600 square foot expansion and renovation of lunchroom, locker rooms, bathrooms, break rooms, and training rooms. Project involved wood, concrete and steel construction.
Polymer Group International
(PGI) 2007-2009
Location: Waynesboro, Virginia
PGI has called on Segars Engineering to perform planning, structural analysis, machine layout and design, and soils and materials testing and analysis.
 
 
 
Ming Garden – Floodwall and site
design 2006-2009
Location: Waynesboro, Virginia
Flood protection for a 12,800 SF building in the floodplain
Complete siteplan for 2 acre site including sidewalk, curb and gutter, lighting, pavement and entrance ramp
Construction administration and inspections with application for enterprise zone credits resulting in over $40K reimbursement.
Korean Church 2008-2009
Location: Charlottesville, Virginia
Architectural and Structural design for 12,000 SF facility.
Coordinated geotechnical study and made recommendations and modifications to the site plan as a result.
Construction Administration for owner-contracted work.
Klann, Inc. Structural upgrades,
2008-2009
Location: Waynesboro, Virginia
Structural upgrades for apx. 100,000SF of warehouse and production space
Obtained roof loads and capacity.
Performed steel testing and designed economical reinforcing for supporting process piping, sprinklers and HVAC loads.